Drilling & Boring Operations
See how drilling professionals on geotechnical and construction projects are digitizing their rig scheduling, field logs, and equipment compliance with Omnant's purpose-built boring log software.
On boring programs of every size, from a handful of borings for a school addition to hundreds along a highway corridor, Omnant helps to:
- Schedule rigs and crews against project commitments, so conflicts surface before you promise a start date
- Capture daily logs and boring data at the rig, with no waiting on paperwork and no rekeying
- Keep every rig and instrument tied to its calibration and maintenance schedule
- Move boring logs from the field to the lab and the engineer without delays
Specific Drilling Applications
Omnant supports your drilling work from mobilization to final log, across geotechnical borings, foundation programs, and the subsurface investigations that guide construction decisions. With boring log software built for this work, your crews, rigs, and data stay connected to the project teams who rely on them.
Rig & Crew Scheduling
Rigs are expensive to move and expensive to leave idle. Omnant shows which crews and rigs are committed to which projects, so conflicts surface while there's still time to move something. Scheduling lives in one place, not in a spreadsheet and a whiteboard.
Daily Logs from the Field
Daily log sheets come back from the rig in the same system that scheduled it. Nobody waits on paper, and nobody retypes it at the office. Omnant also integrates with BoreDM, so boring data can move into the tools your geotechnical team already uses.
Rig Calibration and Maintenance Compliance
Every rig and instrument stays tied to its calibration schedule. Equipment that's coming due gets flagged before it leaves the yard, not after it reaches the site.
Drilling & Boring FAQs
Take the next step. Contact us or schedule a personalized demo to see how Omnant's boring log software keeps your rigs, crews, and field data working from the same page.